RFQ Checklist
- Specify magnet grade class, max operating temperature, and demagnetization margin targets
- Provide carrier/housing datums, air-gap targets, concentricity or runout limits, and adhesive constraints
- Define coil interface data (wire gauge, resistance window, insulation or potting constraints) if electromechanical integration is required
- Define balancing acceptance target (for example G2.5/G6.3) and test speed
- List required shipment documents: CoC, material certs, inspection pack, and destination compliance docs



