Magnetic Assemblies
Use this group when magnets, carriers, coil interfaces, bonding, air-gap-adjacent geometry, runout, balance, or compliance documents affect the build.
Required CAD inputs
STEP/STP files, PDF drawings, magnet grade window, coating route, orientation map, carrier datums, coil interface notes, quantity, and timing.
CTQ assumptions
Magnet-seat datums, air-gap-adjacent features, concentricity, runout, balance target, retention method, and thermal envelope.
Inspection expectations
CMM checks, runout or balance record, visual/bonding notes, material certificates, and destination document routing.
Document-pack output
Inspection records, material or CoC package, balance evidence when scoped, and pre-ship release notes.
Acceptance gate relevance
RFQ lock, pilot verification, pack freeze, and pre-ship release are defined before assembly assumptions drift.
Downloadable Assets
- Magnetic RFQ Input Template (CSV)Required RFQ inputs for grade window, CTQ datums, air-gap assumptions, balance criteria, and project timing.
- Acceptance Gates Template (Markdown)Gate-by-gate acceptance structure from RFQ lock through pilot and pre-ship release.
- Document Pack Checklist Template (CSV)Pre-ship document checklist for CMM, balancing records, certificates, and compliance routing.