RFQ Checklist
- Provide STEP and drawing with leak-critical dimensions
- Specify fluid type, test pressure, and leak threshold
- Define sample quantity and timeline milestone
- Attach mating-interface standard and torque expectations
CNC machining support for two-phase direct-to-chip cold plate hardware where leak-path control and micro-channel consistency drive deployment readiness.
Core bottleneck: AI thermal teams face rising heat flux while available two-phase-ready cold plate supply remains constrained.

| Metric | Typical Range | Why It Matters |
|---|---|---|
| Leak validation path | Helium leak test or pressure-hold per RFQ acceptance | Two-phase cooling risk is dominated by leak-path failures and sealing defects. |
| Micro-channel tolerance capability | Drawing-defined CTQ verification with CMM checkpoints | Small channel deviations can change thermal and pressure behavior materially. |
Leak outcomes are qualified only under agreed test setup and acceptance criteria. System-level conditions outside that envelope require additional validation.
Yes. We can stage prototype-first machining and lock CTQ checkpoints before repeat supply.

Decision-focused articles aligned to this page's component scope and sourcing risks.
DFM and validation checklist for leak-critical two-phase cold plate hardware.
Read technical briefUpload CAD and drawings for a one-business-day first response when the RFQ package is complete. We review manufacturing risk before quote direction and partner-route planning, rather than issuing blind automated pricing.
Typical 5-9 working day CNC sample timing applies only after scope, material, inspection, partner route, and schedule are qualified. Pilot support is scoped separately after prototype assumptions are clear.
Inquiry Email
For NDA-sensitive drawings, include your revision ID and target timeline in the first email.